Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the reobiz domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6121
Net Zero Engineering – Aquatic Centre Electrification

Aquatic Centre Electrification: Dive into Engineering Excellence

This site was one of the largest natural gas-consuming facility of City of Melbourne’s portfolio. Based on the existing electrification feasibility report from the head consultant, PROVEE delivered detailed design and tender documentation for a 100% degasification retrofit project.

Our detailed design has overcome challenges such as spatial, structural, and acoustic constraints, as well as electrical capacity shortfall.

Project Details

  • Category: Net Zero Engineering
  • Client: 3E Group
  • Location: City of Melbourne
  • Facility: Sports and Aquatic
  • Service: Full Design